Bloom Lake

Visionary projects

Champion Iron brings together tangible mining projects
and high-potential exploration projects.

Bloom Lake

Bloom Lake

Location:
Québec, Canada

On April 11, 2016, Champion Iron officially became the new owner of the Bloom Lake Mine facilities, acquired from Cliffs Natural Resources for $10.5 million.

The property is approximately 13 km north of Fermont, Québec and 10 km north of the Mont Wright iron ore mining complex belonging to ArcelorMittal Mines Canada.

The Bloom Lake Mine facilities include a railway that ensures transport of the high-quality iron concentrate to a loading port in Sept-Îles, Québec.

Quebec Iron Ore also has 29 residences, two hotels that can house up to 700 fly-in/fly-out workers, and a high-end entertainment centre with a cafeteria that can serve 600 people.

Groundbreaking investments

Significant investments and structural changes were completed prior to the successful recommissioning of the project in February 2018 including: a new 3.5-kilometre conveyor connecting the mine and plant, an upgrade to the concentrator plan, and access to a new multi-user berth at Pointe-Noire. To date, nearly US$4 billion have been invested in the Bloom Lake Mine complex.

World-class ore

Bloom Lake’s iron ore in numbers:

  • Prior to recommissioning in February 2018, the mineral reserves of Phase I were estimated at 411.7 million tonnes, with an average content of 30% Fe. The Phase II expansion project estimates mineral reserves of 807 million tonnes, with an average content of 29% Fe.
  • The Phase I project has a nameplate capacity of 7.4 Mtpa of high-grade 66.2% Fe iron ore concentrate with an initially estimated 21-year mine life. The Phase II expansion project proposes a nameplate capacity of 15 Mtpa of high-grade 66.2% Fe iron ore concentrate with an estimated 20-year mine life.
  • The Phase I project has a target recovery rate of 83%, while the Phase II expansion project has a target recovery of 82.4%.
  • The Phase I Feasibility Study estimated an average production cost of C$44.62/dmt (C1 Cash Cost), while the Phase II expansion Feasibility Study estimated an average production cost of C$46.6/dmt (C1 Cash Cost).
  • The initial Feasibility Study released on February 16, 2017 estimated a Net Present Value (NPV 8%) after-tax of C$984M. The Phase II expansion Feasibility Study released on June 20, 2019 estimates a Net Present Value (NPV 8%) after-tax of C$2.384B.

A proven track record

Following the release of the Phase I Feasibility Study in February 2017, the Champion Iron team successfully recommissioned the project on time and on budget in February 2018. With a proven track record and a growing global customer base, Champion Iron is well positioned to consider the completion of the Phase II expansion project as detailed in the Feasibility Study released in June 2019, which proposes the doubling of the nameplate capacity at Bloom Lake to 15 Mtpa.

Along with this track record, access to infrastructure, a long mine life, quality reserves with low contaminants and aligned communities and partners, Bloom Lake is rapidly becoming one of the major long-term iron mines in the Nord-du-Québec region.

See the Phase I Project Feasibility Study »

See the Phase II Expansion Project Feasibility Study »